Location – Skelmersdale, Lancashire
Main Contractor – Summers Inman
Contract Value – £2.2 million
Duration – 16 Weeks
Description of Works:-
- Supply and installation of various large floor standing external AHU’s to serve the PC50 Process Line, multi-pack and Snack-A-Jacks lines along with 1 No. stainless steel duct process system serving the main over / fryer.
- Installation of Full turnkey package incorporating secondary support steel work, temporary scaffolding, loading out / roof protection, installation of fall arrest / burglar bars, drip trays, displacement duct diffusers / sock ducts, local dedicated chilled water installations complete with a dedicated in-duct DX system serving the chocolate chip room along with all associated insulation packages and BMS / Controls wiring.