- Incoming Services (Water and District Heating Mains)
- LTHW / MTHW Heating Systems
- Domestic Hot Water Services
- Boosted Domestic Cold Water Services
- Boosted Lab Cold Water Services (Cat 5)
- Ventilation Systems
- Fume Extraction Systems
- Fume Cupboards
- Biological Safety Cabinets
- BMS Control Systems
- Specialist Gas Services
- Vacuum Systems
- Compressed Air
- Air Conditioning
- Above ground drainage (Vulcathene and UPVC)
W & S Building Phase 2 – Loughborough University
Location – Loughborough, Leicestershire
Main Contractor – Henry Brothers
Contract Value – £3.9m
Duration – 52 weeks
Description of Works – A wide variety of Mechanical Services were designed and installed to newly formed Laboratories, Teaching Areas, Offices and toilets, all detailed as follows:-