Location – The Bridge, Lincoln
Main Contractor – Henry Brothers
Contract Value – £438K
Duration – 35 weeks
Description of Works – The Bridge building is a purpose built 2 storey building containing wet labs, clean rooms and laboratories, including welfare areas WC’s, Tea Stations and store rooms. A wide variety of Mechanical Services were designed and installed by William Bailey, all detailed as follows:-
- Incoming Services (Water and Natural Gas)
- LTHW Heating Systems
- Gas Fired Domestic Hot Water Services
- Boosted Tanked Domestic Cold Water Services
- Boosted Laboratory Cold Water Services (Cat 5)
- Mechanical Ventilation Systems Via Air Handling Units
- Designated Fume Extra System
- Fume Cupboards
- BMS Controls Systems
- Laboratory Specialist Gases
- Air Conditioning
- Above ground drainage (Vulcathene and UPVC)