Location – Loughborough, Leicestershire
Main Contractor – Henry Brothers
Contract Value – £2.6m
Duration – 52 Weeks
Description of Works – A new building comprising of Teaching Areas, Staff Offices and Laboratory Areas. A wide variety of Mechanical Services were designed and installed by William Bailey, all detailed as follows:-
- Incoming Services (Water and Natural Gas)
- LTHW / MTHW Heating Systems
- Domestic Hot Water Services
- Boosted Domestic Cold Water Services
- Boosted Lab Cold Water Services (Cat 5)
- Ventilation Systems
- Fume Extraction Systems
- Fume Cupboards
- Biological Safety Cabinets
- BMS Controls Systems
- Specialist Gas Services
- Vacuum Systems
- Compressed Air
- Air Conditioning
- Above ground drainage (Vulcathene and UPVC)