Location – Nottingham Trent university, Clifton Campus
Main Contractor – Henry Brothers
Contract Value – £1m
Duration – 38 weeks
Description of Works – A new building comprising of Teaching Areas and Staff Offices. A wide variety of Mechanical Services were designed and installed by William Bailey, all detailed as follows:-
- Incoming Services (Water)
- LTHW Heating Systems
- Domestic Hot Water Services
- Boosted Tanked Domestic Cold Water Services
- Natural Ventilation, Hybrid and Mechanical Ventilation Systems
- BMS Controls Systems
- Air Conditioning
- Above ground drainage (UPVC)