Location – Glossop, Derbyshire
Main Contractor – Henry Brothers
Contract Value – £3m
Duration – 52 Weeks
Description of Works – A new building comprising of Teaching Areas, Staff Offices, Sports Hall, Library, IT Suite, Function Studio, Main Hall and Science / Laboratory Areas. A wide variety of Mechanical Services were designed and installed by William Bailey, all detailed as follows:-
- Incoming Services (Water and Natural Gas)
- LTHW Heating Systems
- Gas Fired Domestic Hot Water Services
- Boosted Tanked Domestic Cold Water Services
- Boosted Laboratory Cold Water Services (Cat 5)
- Natural Ventilation, Hybrid and Mechanical Ventilation Systems
- LEV Extraction Systems
- Fume Cupboards
- BMS Controls Systems
- Laboratory Natural Gas Services
- Air Conditioning
- Above ground drainage (Vulcathene and UPVC)